Composite and Trex deck builders in Terre Haute

We build composite and Trex decks, plus pressure-treated wood decks, for homeowners in Terre Haute and nearby towns like Brazil, Clinton, Sullivan and Greencastle, from the footers to the railings, with the permit and cleanup in one price.

Brick ranch with a new brown composite deck, black aluminum railing, box step and a gable-roof screened sunroom
Trex deck with screened sunroom and aluminum railing – Terre Haute, 2026

Composite and Trex decks built from the footers up

We build new decks, and when an old deck is worn out, we tear it out and build a new one: Trex composite decks, and pressure-treated wood decks when the budget calls for it. Our crew digs and pours the footers, frames the deck, lays the boards, builds the stairs and railings, pulls the permit and hauls away the mess. You deal with one company from the first phone call to the final walkthrough.

Jacob Zimmerman, our lead carpenter, picked up carpentry in high school and sharpened it in the carpenters’ union, and co-owner Ryan Bolinger runs the day-to-day on every job. We build decks in Terre Haute, Brazil, West Terre Haute, Clinton, Sullivan, Linton, Greencastle, Rockville, Clay City and the towns in between, plus nearby Illinois towns like Marshall and Paris. In Terre Haute in 2026, we tore out one old deck and replaced it with Trex Select and aluminum railing, and rebuilt another in Cedartone treated lumber with black cable railing.

Our office is at 300 Ohio Street, Suite E, in Terre Haute. We don’t take walk-ins, so please call first if you’d like to stop by.

Wide brown composite deck with black aluminum railing leading to a screened sunroom and French doors
Trex Select deck with picture-frame border – Terre Haute, 2026
  • Small Trex deckaround $15,000What our smaller decks have run
  • Large Trex Transcend deckover $100,00050-year decking on larger decks

Prices checked October 2026. Every proposal is one all-inclusive price: permits and sales tax built in.

See all our prices and what’s included

We only build full decks

We only build full decks — new framing, footers and decking. We don’t re-deck, and we won’t put Trex over an old frame.

Why so strict? Trex boards carry 25- to 50-year limited warranties, and they’re only as good as the frame under them. An old frame has already spent years in the weather, and new boards would hide whatever shape it’s in. So if your deck is worn out, we tear it out, haul it off and build the new one from the footers up.

Composite, synthetic or Trex: what’s the difference?

Homeowners use all three words for the same kind of deck. Composite and synthetic decking both mean man-made deck boards instead of natural lumber, made to skip the sanding, staining and sealing a wood deck needs. Trex is a brand of composite decking, and it’s the one we install. When someone asks us for a synthetic deck or a Trex deck, we build it with Trex Enhance, Select or Transcend boards.

What a composite deck costs with us

Small Trex decks have come in around $15,000. On larger projects, we’ve bid 50-year Trex Transcend decks at over $100,000. Every one is a full build, with new footers, framing, decking and railing, and the permit and sales tax are in the price.

We don’t price by the square foot. Every proposal is built from the actual cost of your job: materials, labor, equipment, permits and overhead. That’s why two decks of the same size can come in at very different numbers.

What drives the price

  • Size. More deck means more footers, more framing, more boards and more labor. Angles, curves, multiple levels and picture-frame borders take more cutting and framing than a plain rectangle.
  • Height. A second-story deck needs taller posts, more bracing and a longer run of stairs than one a step above the patio.
  • Stairs, ramps and landings. Each one adds framing, boards and railing.
  • Railing. A long, narrow deck has more feet of railing for its size than a square one. Treated wood is the budget choice; composite, aluminum, cable and glass cost more.
  • Which Trex line. Trex Enhance, Select and Transcend step up in price in that order, and so do their warranties. Pressure-treated lumber costs less than any Trex line, and we price treated decks after the site visit.
  • Demolition of the old deck. Tearing out and hauling off an old deck is real labor and real dump fees, and it’s part of every replacement, since we don’t build over an old frame.
  • Framing. Green treated, Cedartone treated or steel.
  • Covers and extras. A roof, a pergola or a screened porch; lighting; post sleeves; fascia; reinforced framing under a hot tub.

Your proposal rolls all of it into one all-inclusive price, with the permit and sales tax in it. Our deck cost guide has real project totals from our own jobs.

Synthetic decking vs. wood

MaterialManufacturer warrantyUpkeepRelative cost
Pressure-treated lumberVaries by lumber supplierWash it and re-seal or stain it on a schedule. Boards check, cup and fade over time.$
Trex Enhance25-year limitedSoap and water. No sanding, staining or sealing.$$
Trex Select35-year limitedSame as Enhance$$$
Trex Transcend50-year limitedSame as Enhance$$$$

The dollar signs show the order from least to most expensive, not a price.

We’re a TrexPro® contractor at the basic level. The warranty on Trex boards is Trex’s own limited warranty, 25, 35 or 50 years depending on the line, and it passes straight through to you. We don’t offer enhanced or extended Trex warranties.

One honest note on choosing: if composite would stretch your budget thin, a well-built treated deck beats a cheaply built composite one. The footers and framing matter more than the boards.

How we build a composite deck

Footers below the frost line

Every new deck we build sits on poured concrete footers dug 48 inches deep. That’s below the frost line in our area, so freezing and thawing ground doesn’t heave the deck. Footer size is set by the deck’s size and design and by the building code. We call 811 before we dig so buried gas, electric and cable lines get marked, and we mix concrete on site with a MudMixer for a consistent pour.

Posts sit on metal plates held to the footers with anchor bolts, so the wood never touches concrete or dirt. That keeps water out of the end grain, which is where rot starts.

Framing

The frame is the part you stop seeing once the boards go down, and it decides how long the deck lasts. We frame with pressure-treated lumber: standard green treated, or Cedartone, a brown-toned treated lumber we like on composite decks that sit up high with the posts in view. Steel framing is an option at a higher cost.

Picture frames and divider boards

A picture-frame border is a run of boards around the outside edge of the deck, so you see a clean finished edge instead of the cut ends of every board. A double picture frame runs two rows deep. Divider boards break up a long deck so you don’t see board ends butted together across the middle.

Composite deck step and landing with a double picture-frame border, wet after rain
Double picture-frame border on a Trex step – Terre Haute, 2026

Railings, stairs and permits

Railing options run from pressure-treated wood to composite, aluminum, cable and glass. Aluminum railing never needs stain. Stairs and railings are built to the code the permit is inspected against. We pull the permit and schedule the inspections, and the permit cost is built into our price along with sales tax.

Corner of a brown composite deck with black aluminum railing, box step and potted flowers on a sunny day
Trex deck corner with aluminum railing – Terre Haute, 2026

Screened porches, covers and sunrooms

A deck can be the start of a bigger outdoor project. We can build a roof over part of the deck, a pergola for filtered shade, or a screened porch that keeps the bugs out in July. Composite boards get hot in direct afternoon sun, and shade from a cover helps. A sunroom goes a step further, with walls and windows so you can use the space more months of the year.

If you’re thinking about any of these, tell us at the first visit. Footers and framing for a future roof are much easier to plan now than to add later.

Gable-roof screened sunroom on a brown composite deck with black railing beside a brick ranch, sunny sky
Screened sunroom on a new Trex deck – Terre Haute, 2026

How a deck project runs

  1. Call or request an estimate — Doug Stoliby, our sales manager, reaches out within 1 business day.
  2. Site visit — We measure, look at the house and any old deck, and talk through materials, layout and railing.
  3. Budget and scope — Within 5 business days, a written scope that names the decking, railing and framing.
  4. Proposal and agreement — One all-inclusive price with the permit and sales tax in it, e-signed in JobTread and good for 7 days.
  5. Permit, tear-out and footers — We pull the permit, call 811, remove the old deck and pour the footers.
  6. Framing, decking and railings — Follow the schedule, approve change orders and see inspection results in your JobTread client portal.
  7. Final walkthrough — Punch list, then a Notice of Substantial Completion, which starts your warranty.

Every day on site ends with cleanup and debris hauled away at our cost. We lay plywood to protect your lawn and driveway, and we run a magnetic sweep for stray nails and screws. There’s more on how we run a job in how we work.

Paying for a deck

Decks are on our short-job payment schedule: typically 75% at signing and 25% on completion. You can pay through the online invoice link, by check or in cash.

Warranty

Our one-year workmanship warranty starts at substantial completion and covers problems that come from how we built the deck. It doesn’t cover normal wear and tear, material defects (those go to the manufacturer’s warranty), damage by others, or weather. If something comes up, we schedule a warranty visit within 7 business days.

★★★★★

Amazing Work! Excellent Customer Service! Highly Recommend. 5 ⭐️

Steve JohnsonGoogle review
★★★★★

Awesome company ,good work that they stand by.

Jimmy BousmanGoogle review
★★★★★

White Rock Contracting has done several different jobs for us. Derek and his staff are knowledgeable, polite and on time. They have cleaned our gutters, replaced an exterior door and replaced rotting moulding around our doors. They are reasonably priced, come out on time and are very good at communicating about the projects.

Lynn WilkeyGutters customer

5.0 stars from 82 reviews. Read them on Google (71), Facebook (10) and our TrexPro profile (1).

Who we’re not a fit for

We’d rather tell you now than waste your time or ours.

  • The cheapest bid. If price is your only priority we likely aren't the right choice. You can always find a lower number. We price for specific quality materials, professional project management, plans & permits, proper insurance (liability & workers' comp) and livable wages for our crew.
  • Small service calls. We don't take handyman jobs or small general repairs under about 4 hours. Roof repairs are a separate service.
  • Standalone trade work. We don't do standalone HVAC, electrical or plumbing unless it's part of a larger design/build project.

Not sure where your project lands? Call us at (812) 605-2560 and we’ll point you in the right direction.

Composite and Trex deck questions

How much does a composite deck cost in Terre Haute?

Small Trex decks have come in around $15,000, and we’ve bid 50-year Trex Transcend decks on larger projects at over $100,000. Size, height, stairs, railing, the Trex line and tearing out an old deck set the total, and a site visit gets you a real number for your yard. Our deck cost guide has real project totals.

Can you put new Trex boards on my old deck frame?

No. We only build full decks: new framing, footers and decking. We don’t re-deck, and we won’t put Trex over an old frame. If your deck is worn out, we tear it out and build a new one from the footers up.

Is synthetic decking the same as composite or Trex?

To most homeowners, yes. Synthetic and composite both describe man-made deck boards instead of wood, and Trex is the brand of composite decking we install, in three lines: Enhance, Select and Transcend.

Is composite decking worth the extra cost?

If you’d rather spend summers on the deck than working on it, usually yes. Composite needs soap and water, not sanding and sealing, and the Trex lines we install carry 25- to 50-year limited warranties. Pressure-treated costs less up front and is still a solid deck when it’s footed and framed right.

Do I need a permit for a deck?

We pull a permit wherever one is required and schedule the inspections. The cost is built into our price, so you don’t have to deal with the permit office.

Can you build a deck that will hold a hot tub?

Yes. A filled hot tub is heavy, so the framing and footers under it get reinforced for its filled weight. Tell us about the tub at the first visit so the deck is designed for it from the start.

How long does it take to build a deck?

Most decks take 1 to 2 weeks on site once materials arrive, and covered or screened decks take longer. Most projects can start 2 to 6 weeks after you sign, and later in peak season. Your proposal lists approximate start and completion dates, and weather, material deliveries, inspections and change orders can move them.

What warranty comes with a new deck?

A one-year workmanship warranty from us, starting at substantial completion, plus the manufacturer’s limited warranty on the boards: 25 years on Trex Enhance, 35 on Trex Select and 50 on Trex Transcend.

Ready to talk about your composite deck?

Send us a few details and Doug Stoliby, our sales manager, will contact you within one business day to discuss your goals, answer questions and schedule a site visit.

Doug Stoliby, Sales ManagerDoug will reach out within 1 business day.